Sunday, May 17, 2009
Our weekend in a nutshell
We finished texturing the ceilings in the whole house. We textured our walls in the master bedroom. It is the only walls we are texturing. We kind of messed them up texturing the ceilings to we didn't really have a choice. We started ripping out the tile in the hall way in kitchen. What were we thinking that is hard work.
This is Zack hanging out in the guest bedroom. We put a pool up in the back yard to he has something to do while we work. He doesn't last long it is in the shade and is super cold.
Here is Cliff taping the ceilings in our room so we don't mess up the what is already textured.
This is the texture in our bathroom. I know it is super hard to tell but it is called grass texturing we think.
This is the removal of the tile. We are so sore today.
This is Zack hanging out in the guest bedroom. We put a pool up in the back yard to he has something to do while we work. He doesn't last long it is in the shade and is super cold.
Here is Cliff taping the ceilings in our room so we don't mess up the what is already textured.
This is the texture in our bathroom. I know it is super hard to tell but it is called grass texturing we think.
This is the removal of the tile. We are so sore today.
Subscribe to:
Post Comments (Atom)
1 comment:
Keep it up girl! It will be look fabulous in no time:) Love Carrie
Post a Comment